# YUNG FLON PRIMER WHITE (FOR STEEL)
RAINBOW PAINTS
## Product Code
No.5400MP
## Type
Two-component anti-rust primer formulated with special modified epoxy resin and anti-corrosion pigments.
## Application
Anti-rust primer for steel pipes, steel frames, bridges and factory steel structures, applied over zinc-rich shop primer to eliminate topcoat bubbling defects.
## Properties
1. Hard, tough film with excellent adhesion
2. Strong adhesion over zinc-rich primer, fills primer pores to prevent topcoat bubbling
3. Excellent abrasion resistance and electrical insulation performance
4. Outstanding resistance to oil, solvents and chemical reagents
## Specification Data
- Gloss: Flat
- Color: Red Brown
- Hiding Power: ≥8 m²/L (mixed paint)
- Specific Gravity: ≥1.50 kg/L (mixed paint)
- Viscosity: 65~80 KU (25°C)
- Drying Time
- Tack-free: Within 1 hour (25°C)
- Hard dry: Within 6 hours
- Full cure: 7 days (25°C)
- Film Thickness: Wet film 105 μm, Dry film 45 μm
- Theoretical Coverage: 9.5 m²/L, 6.3 m²/kg (@45μm dry film)
- Recoating Interval: Minimum 8 hours (25°C)
- Mix Ratio: As printed on bucket
- Volume Solids: 43% (mixed paint)
- Pot Life: 8 hours at 25°C
- Thinner: No.1005 Thinner SP-12
- Thinner Dosage: 5~15% by weight (excluding tool cleaning)
## Compatible Primers
No.1006 Epoxy Zinc Rich Primer (EP-03AA), No.1011 Inorganic Zinc Primer (IZ-01)
## Compatible Topcoats
Full series Rainbow topcoats, polyurethane finish, chlorinated rubber finish, ULI topcoat
## Storage Stability: Minimum 3 years under normal storage
## Application Methods
Brush Coating, Airless Spray, Roller Coating
### Airless Spray Parameters
- Nozzle size: 0.019" ~0.023"
- Air pressure: 5~6 kg/cm², pressure ratio ≥45:1
## Construction Precautions ⚠️
1. Mix base and hardener evenly per specified ratio, stand 10~20 minutes for reaction before use.
2. Fully remove moisture, grease, sludge, dust, rust and corrosive salts from substrate surfaces.
3. Avoid construction when temperature below 10°C or relative humidity exceeds 85%RH; fully dry damp surfaces before coating.
4. Clean all coating equipment immediately after use.
5. Maintain full ventilation during confined tank interior construction.
## Note
All datasheet data are internal laboratory test results for construction reference only. Actual performance varies subject to different service environments. This document does not constitute legal warranty of the manufacturer. Contact Rainbow technical department for inquiries.